Here is a step-by-step questionnaire for a greenfield SAP WM/EWM implementation, where the warehouse is designed from scratch rather than migrated from an existing setup. Because there is no legacy system to copy, the focus shifts to designing the target process, validating it with the business, and building the configuration around it.

Step 1: Strategy and Scope

  1. What is the business case for the new warehouse (new site, capacity growth, compliance, automation, customer requirements)?
  2. Is this a new site, a new process, or a new business model?
  3. Which WM or EWM option fits the requirement (classic WM, embedded EWM, decentralized EWM)?
  4. What are the target KPIs (throughput, pick accuracy, dock-to-stock time, order cycle time, cost per order)?
  5. What is in scope and out of scope for go-live (sites, product groups, channels, returns)?
  6. What are the key assumptions, constraints, and dependencies (building readiness, automation, labour model)?

Step 2: Business Model and Volumes

  1. Which products, product groups, and special handling requirements are stored (hazardous, temperature-controlled, high-value, serialized)?
  2. What are the expected inbound and outbound volumes by day, week, and peak season?
  3. What order profiles exist (single-line, multi-line, B2B, B2C, kitting, value-added services)?
  4. Which customers, suppliers, carriers, and channels must the warehouse support?
  5. What growth is expected over the next three to five years?

Step 3: Target Process Design

  1. What are the target inbound processes (ASN, PO, production, returns, cross-docking)?
  2. What are the target storage principles (fixed bin, random, chaotic, zone-based, dedicated bulk)?
  3. What are the target picking methods (single order, batch, wave, zone, pick-by-voice, pick-by-light, RF)?
  4. What are the target packing and shipping processes (packing stations, handling units, carrier integration)?
  5. Which processes will be automated, and which will remain manual?
  6. Which processes must reflect best practice rather than legacy habits?

Step 4: Layout and Warehouse Structure

  1. What is the building layout, including docks, staging, racking, mezzanines, and office space?
  2. How will storage types, storage sections, and bin types be defined?
  3. What is the bin coding logic (aisle, rack, level, position) and how will it support future expansion?
  4. How will the layout minimise travel distance (zone design, flow direction, slotting logic)?
  5. What capacity rules apply (bin capacity, weight, volume, pallet positions, peak buffers)?
  6. What equipment is needed (forklifts, conveyors, AS/RS, scanners, label printers)?

Step 5: Master Data Design

  1. Which materials and units of measure are required, and what is the material master data strategy?
  2. Which batch, serial number, and handling unit rules apply?
  3. How will bins, storage types, and resource data be created and maintained?
  4. Who owns each master data object, and what approval process applies?
  5. What data quality rules and validations must be enforced from day one?

Step 6: Stock and Inventory Design

  1. Which stock types and special stocks are required from the start?
  2. What inventory management approach will be used (cycle counting, physical inventory, annual stocktake)?
  3. What discrepancy thresholds should apply, and who approves changes?
  4. How will stock be opening-balanced at go-live (initial load, first receipt, physical count)?

Step 7: Strategies and Rules

  1. Which putaway strategies will be used (fixed bin, open storage, near-zero, capacity-based)?
  2. Which removal strategies will be used (FIFO, FEFO, LIFO, zone-based)?
  3. Which replenishment methods will be used (min-max, on demand, automatic)?
  4. Which packing and handling unit rules are needed?
  5. How will priorities, wave rules, and queue logic be defined?

Step 8: Integration and Documents

  1. Which interfaces are needed with ERP, TM, carriers, WMS hardware, labelling, and customs?
  2. Which documents must be produced (delivery notes, labels, CMR, DG forms, shipping papers)?
  3. Which reports are required from day one (stock by bin, movements, aging, subcontracting, consignment)?
  4. What retention and archiving rules apply?

Step 9: Configuration Design

  1. Which organizational units are required (company code, plant, storage location, warehouse number, EWM warehouse)?
  2. Which movement types, process types, and warehouse process types are needed?
  3. Which storage type search and placement sequences apply?
  4. Which authorizations and roles does each user group need?
  5. How will configuration be documented and transported across environments?

Step 10: Validation and Testing

  1. Which scenarios must be tested (unit, integration, end-to-end, performance, peak volume)?
  2. Who signs off each scenario (process owner, warehouse manager, finance, quality, IT)?
  3. What test data and volumes will be used?
  4. What are the defect severity levels and acceptance criteria?

Step 11: Go-Live and Hypercare

  1. What is the cutover plan for master data, stock, and open documents?
  2. Is there a rollback plan and decision point?
  3. What training, super-user support, and standard work instructions are needed?
  4. What hypercare period is planned, and what is the escalation path?
  5. What performance metrics will be reviewed after go-live, and how often?

Tip: In a greenfield project, validate the target design with operators, supervisors, and simulations (layout walk-throughs, throughput calculations, and scenario workshops) before configuring. Design decisions made early are the hardest and most expensive to change later.